28 September 2009

Well, it's taken long enough!

On my last trip to my LHBS, I picked up a March pump and some fittings. The kettle keeps getting heavier to lift. So I am 2/10th of the way to having a completed brewing system. All I need now is two kegs, three burners, a frame, another pump, and an electronic controller.

C'mon, Lotto!


posted by hiikeeba at 09:01

0 Comments:

Post a Comment

<< Home